This blog aims to follow the restoration of SRJ No. 16, later SJ No.33, by the Roslagsbanans Veterantågsforeningen in Stockholm, as well as our ongoing maintenance of a vintage train on the Roslagsbanan. This is a personal view of our activities, the official site of our group (in Swedish) is linked above.

Please note: all pictures on this blog are taken by me unless otherwise stated, and are copyright. If you wish to use them elsewhere, please contact me.

Wednesday, 12 August 2015

Dry air and ceilings

A small group this week, 3 of us, with most people still away on summer holidays.  Fitting of the dry air supply to 880 continues with the seat refitted over the unit, it fits - just!  Now that's precision for you.



The detector is being mounted on the other side of the central bulkhead, it was decided that mounting it beside the unit itself might give us somewhat false readings!  Micke is also manufacturing a distributer for the outlet of the unit to help mix the dry air within the carriage.


I'm continuing with the ceiling on 33, rubbed down about 20% of it for the second topcoat.


Also manufacturing new trim to cover joins between panels, and ends of planks on the ceiling.  Now, in an ideal world, we would use ash, steamed and bent to shape.  This is not an ideal world!  Fir works OK if you soak it for a couple of hours in warm water then clamp it to a former (this being left over from stretching the canvas over the roof, so is approximately the right radius).


Rebuilding of Stockholms Östra station continues between our two sheds.  Here the new station throat layout begins to take shape



As ever, all the best from Stockholm, George!

Wednesday, 5 August 2015

... and back to business

Now that fieldwork is over for the summer and a short holiday is sadly behind me, it is time to get back to regular posts.

While I have been away, a number of jobs have been progressed:


There was a substantial sag in the floor, just inboard of the access hatch for the southern bogie.  Rather than rip the whole floor apart, we decided to build up the area.  Bengt and Lasse have been working on this over the summer.


A new piece of oak has been let into the frame around the access hatch, and a steel band used to stabilise the old floorboards.  The low area was then built up with laminations of hardboard and sanded back to level.  The whole floor will later be covered in hardboard with new lino on top.



In the paintshop I found one of the access panels that sit over the doors, covering wiring and such.  Someone had started to renovate this one, so I added another coat of paint.


Here is one I renovated earlier, with teak trim added and in place.  It is held by 2 set-screws for easy access behind


Work has also been ongoing on the sandboxes at the north (B-) end.  This is the base unit of one hopper (that sits below the drivers seat) and the pipe that carries the sand down towards the wheels


The sandboxes are air operated, inside you can see the brass air nozzle (not in place) that blows the sand into the hole seen beside it.  Again, I gave this another coat of paint last night.


On the other side of the mainline, Micke and Daniel were busy installing a dry air unit into 880, our 1914 build teak carriage which, for the moment, lives outside


Meanwhile, on the Roslagsbana, major work was going on all around the Stockholms Östra site.  Here, their tower wagon (self propelled with a chain drive from a diesel engine in the lefthand metal box) sits on one of our sidings.


This beast, running on its own rails, was being used to set up a new double-slip at the station throat


Thats all for this week.  Updates should become more regular (every one to two weeks) now that everyone is coming back from summer holidays, etc.  All the best from Stockholm, George!

Monday, 22 June 2015

Catching Up : 2015, the first half

The year started with everything on the roof pretty much complete.  Here you can see the resister bank covers in place as well as a smoothing capacitor and a vent.  Mounting the pantographs will have to wait until we take her out of the shed as there is not enough headroom inside!

A myriad of small fittings have been added inside

Including a pair of these rather nice original drivers desk lights

Interior work has moved to painting of the ceiling, Peter has taken on most of this, while the two Lasse's are replacing windows and frames

Remounted drop- and fixed-lights in B-end saloon

 Anything metal on the outside has to be earthed.  Many of the earthing strips we were able to recover and reuse, but some were made new.  Here, a lamp bracket ...

 ... a handrail ...

... and even the headlamps are all earthed via the chassis and wheels.

Henrik took on the repaint of B-end vestibule, the last major section of the interior to be repainted.  Antique White ceiling and our own mixed yellow based on a recovered sample from a door-jam where it had not faded.  Note the speed he is working to get that gloss ...

 Each April we take part in Tågsläpp, the annual behind-the-doors event at many of Swedens preserved railway sites organised by Järnvägsmusei Vänner (the Swedish Friends of the National Railway Museum)

 As our motorwagon shed and running set lie on the far side of the Roslagsbana's mainline, we run escorted tours across the tracks.

 I've been busy making new wooden trim for the ceiling to replace bits lost or broken.

 There are major upgrades going on at Stockholms Östra, including the laying in of new cables.  Excavations for this project revealed the old turntable pit.  Here Micke is doing a bit of archaeology to show the remaining walls.

The following week it had all been dug out.  Most of the fill appears to be old wood, maybe the turntable deck, but we did find a number of old car exhaust pipes.  We had a carefull look for old locomotive parts, but no luck!

 Back inside, renovations have moved to the footsteps.  A pantograph makes a great place to lay them out while the paint dries!

 So, with a picture of our two operational railcars basking in the sun, that brings me pretty much up to date.  There will be a short pause While I am working in the Swedish sub-Arctic again, but I will endeavour to update this blog every couple of weeks.

best regards from Sweden, George!



Sunday, 21 June 2015

Catching Up : 2014

The year started with further work on roof equipment, specifically the compressed air system that raises and lowers the pantographs.  This carried in all new copper pipework supported in oak blocks.  In the foreground is thebase for one of the pantographs (almost all the oak blocks for that could be reused from before) and the grey cable will carry the power from the pantograph.

Air pipes disappearing down into B-end cab

The air system was hooked up to our big compressor and tested.  Leaks everywhere but many things worked.
 
  
Including the horn!
 

 Cable way covers now canvased and painted in.  Vents in place and the copper earthing strips being laid out

 Final set-up and wiring in of the resistor banks by Bosse and Henrik

 Maintainance on the running fleet.  Micke and Soren on the 2-man spanner!

 Use of our flat wagon for storage of pantographs lost us our barbecue place!  We endure ...

 Moving inside, work has commenced on the inside of the roof.  New wood let in where splits or unnecessary holes occur.

 Light fittings being installed

 Windows are being renovated.  New teak let in where needed, putty renewed with original style red coloured linseed putty, and varnished, several times!

 Windows and frames being installed in A-end saloon


 And finally, No.37 decorated and ready to go out on our Luciatåg, pre-Christmas specials that run weekends at the end of November and beginning of December.






Catching Up : 2013

The year started with attaching the new canvas to the roof.  Lasse had made up a prop to hold the canvas under the edge of the roof while he nailed it down
 
 Inside I was almost done renovating B-end driving cab, so the electrical guys moved in to wire everything in

Control cables being wired back into the electrical cabinate
  
Once the canvas had been well bedded in with home made roof paint (to the original recipe of carbon and cooked linseed oil) we started building up the various cable runs and equipment mountings.  When we laid the canvas, it covered all the holes for screws, bolts, vents, cables etc., so before starting, Lasse and Micke marked the position of each on the roof above.  Lasse is now transfering those positions back onto the canvas with a plumb bob.
 
Cable runs being laid out.  Almost all of the original (1940s) boxes were re-useable, only the tops needed replacing.

 Resistor banks being trial fitted.

With the main canvas down, the headlamp housing could be re-fitted.  Note the extra strips of canvas to seal the join.

 Maintainance on the operational set was ongoing throughout the year.  Here we are brushing off loose varnish from 880 and feeding the wood with teak oil.  A re-varnish is a high priority once we get it under cover, meanwhile we maintain it as good as we can.

Inside, I had moved into B-end saloon.  This is what it looked like to start with.

 On removing a bulging panel, a large number of old tickets, dating back to the 1940s, fell out.

 Building up a good gloss finish takes a while, I think this one had 2 undercoats, followed by 4 topcoats.

But the result is worth it!

 3 pantographs were renovated during the year

 Towards the end of the year we started to refit the window surrounds.  As you can see nothing is straight anymore, but not bad for nearly 100 years old!  Note also the black metal strip that holds the edge of the roof canvas in place.

 New covers on the cable runs on the roof.

 An excellent end to the year was firing up the lights for the first time!